References

Managing the Project

187 sources in the library on managing the project. Each one says what the document covers and what it is good for. Name a source to see which document it is and where to read it. One at a time. Page 4 of 5.

  1. fair RN-38M5ZO

    HomeOwners Alliance

    Which registers to check a trade against and what each actually guarantees. Covers Gas Safe for gas work, competent person schemes for electrics, FENSA and CERTASS for glazing, the Federation of Master Builders, and RIBA Chartered Practices, which must meet RIBA's stated standards of professional practice in quality, customer service and insurance and whose membership can be checked directly. Notes that roofing firms aligned with the NFRC can self certify their work as an all in one service to homeowners, with all domestic work carrying a 10 year warranty, searchable by postcode or name on the NFRC site. Also covers checking insurance, references and Companies House before committing.

  2. fair RN-JLFMVV

    HomeOwners Alliance

    HomeOwners Alliance guide by Angela Kerr setting out four questions to decide whether to appoint an architect: whether the project affects the structure, whether you need design help, whether you want the project managed, and whether an architect or an architectural technician is the better fit. States plainly that there is no law requiring a homeowner to employ an architect and that some people complete whole house refurbishments and extensions without one, while an architect gives more security on work affecting the structure and exterior such as an extension, loft conversion, garage conversion or basement conversion. Notes that an architectural designer or technician experienced in small and medium home renovation projects is cheaper to engage, and that a fully qualified architect must be registered with the Architects Registration Board, whose database is publicly accessible. Also flags planning consultants and structural engineers as alternatives for navigating a local planning authority.

  3. fair RN-88AXRI

    HomeOwners Alliance

    A homeowner tendering procedure with the numbers attached. Aim for at least 3 quotes, which means shortlisting at least 5 builders to invite, since some will not respond. Distinguishes an estimate, an informal educated guess, from a quote, a written agreed price fixed unless the specification changes. Allow between two and four weeks for the tender period, confirm by phone who is bidding, and circulate every answer to all tenderers. Tender returns should include public and employers liability insurance evidence, health and safety policy and record, a bank reference, a professional reference such as from an architect, a customer reference, previous work, years established, and whether employees or subcontractors are used. For the contract: consider a 5% retention held to the end to cover snagging, name the contract period and set weekly liquidated damages, typically £250 to £500 a week on an extension, and list provisional sums for unforeseen work.

  4. fair RN-DX7AAN

    HomeOwners Alliance

    Ten improvements with spend against value added, from HomeOwners Alliance research with the Federation of Master Builders and The Guild of Property Professionals. Removing an internal wall for an open plan kitchen diner costs around £3,500 and adds £48,000 in London or £27,000 in Dorset, and most builders finish it in under a week. Garden room £6,700 adds £36,000 in Surrey or £10,000 in London. Kitchen refresh £4,000 adds £15,000. Downstairs loo in an understairs cupboard £1,500 adds £26,000. Ensuite carved from a master bedroom £5,000 adds about £14,525 in London over roughly 11 days. Off street parking £2,000 adds £13,354 on an average Surrey property, with Direct Line putting a parking space at up to 13% of value. Back garden £4,000 adds £9,000. Repainting £1,000 adds £5,000. Loft conversion £20,000 adds £40,000. Obtaining planning permission costs up to £400 and can add up to 10% of value per Hamilton Fraser.

  5. fair RN-WWNN7R

    HomeOwners Alliance

    Whole house renovation cost benchmarks. Full structural survey £500 to £1,500 and a 10% contingency on the total. Single storey extension £1,800 to £3,000 per m2 with the rate falling as area grows, giving roughly £40,000 to £56,000, £60,000 to £84,000 and £100,000 to £140,000 for successively larger extensions. Loft conversion £27,500 to £75,000 with a dormer averaging £50,000. New bathroom average £6,000. New kitchen £10,000 to £20,000, with 10% of households spending over £50,000. Garage conversion average £6,000. Replacement uPVC window about £400 to £600 supplied and fitted per RICS. Installing central heating from scratch in a three bedroom house about £4,000; replacing a combi boiler about £2,700 per British Gas. Dry rot treatment by a specialist £1,000 to £2,000 per AXA, and woodworm treatment of a three bedroom loft £450 to £800, or £20 to £50 for DIY treatment, with active infestation identified by roughly 2mm holes and fresh sawdust.

  6. fair RN-1H6AUM

    Leeds Beckett University, Leeds Sustainability Institute

    88 side-by-side fan pressurisation and low-pressure pulse airtightness measurements in existing dwellings of differing age, size, form and construction. Results: across the sample the mean airtightness reported by the two methods differed by only 2 per cent, but for individual homes the difference ranged from minus 84 per cent to plus 67 per cent, so the two tests can give wildly different answers on any one house even though they agree on average. Regulatory context stated: UK Building Regulations set a maximum airtightness of 8 m3/m2/h at 50 Pa for new dwellings, reducing to 5 m3/m2/h at 50 Pa or less in 2025 with the Future Homes and Buildings Standard; compliance is demonstrated by fan pressurisation or the newer low-pressure pulse test as set out in CIBSE TM23:2022. There is no maximum airtightness requirement when refurbishing an existing dwelling, though both methods are being used to inform retrofit, and existing homes have more varied and complex leakage paths than new build.

  7. fair RN-74Q5JS

    Leeds Beckett University, Leeds Sustainability Institute

    Field trials plus thermal modelling (Brooke-Peat and Glew, 2021) showing that insulating one house internally can push a damp problem next door. Adding IWI reduces heat transfer from the room into the external wall, so the external wall behind the insulation becomes colder than the neighbour's uninsulated wall; heat then flows towards the colder side, and surface temperatures fall not only behind the insulation but also in the adjacent dwelling around the party wall junction, raising the risk of mould growth and surface condensation in a neighbouring property that has had no work done. The paper notes the legal as well as health implications, and that standard thermal modelling conventions do not cover thermally asymmetric party wall junctions, so the modelling had to split heat flow and surface temperature for each dwelling separately, using linear thermal transmittance (psi-value) and temperature factor (fRsi). Context figures: roughly 10 per cent of UK households are in fuel poverty, rising to 16 per cent of households in uninsulated solid walled homes, and only 7 per cent of ECO measures have been solid wall insulation.

  8. fair RN-WBTLGN

    London Fire Brigade

    How to plan escape from a house or converted flat, which bears directly on loft conversion and window specification. The rule is get out, stay out, call 999 as soon as it is safe. The primary route is the normal way in and out; a second route must be planned in case the first is blocked, and windows are named as that alternative. Door and window keys must be kept where everyone can find them, and security gates or shutters must open from the inside without a key. Cites LFB's average response time in 2016/17 of 5 minutes 25 seconds, and that in nearly half of all fire deaths in 2015/16 there was a delay of 10 minutes or more between the fire starting and the Brigade being called. Around 60% of home fires start in the kitchen.

  9. fair RN-DQ8S9B

    MoneyHelper (Money and Pensions Service)

    Four step method for funding a renovation from the government backed money guidance body. Step one: list everything wanted and ask for written quotes rather than estimates, drawing the distinction that a quotation is an agreed fixed price while an estimate is an approximate price that can change; get at least three quotes, compare them in detail, check reviews, and insist on a written costed agreement, with any extra work priced in a written estimate and a revised costed schedule before it is authorised. Step two: pay from savings where possible while keeping a reserve for unexpected costs. Step three: compare the total cost of borrowing over the shortest period, not just the headline rate, and note that a 0% purchase or balance transfer credit card suits small jobs, that tradespeople may not take cards, and that card purchases of parts can attract Section 75 protection. Step four: use the EPC to identify improvements, and check the Warm Homes local grant, the Boiler Upgrade Scheme for heat pumps and biomass, Warmer Homes Scotland (owned or privately rented for at least a year plus qualifying benefits, with an interest free loan alternative), and the Welsh Nest scheme. States that owner occupiers and private tenants with a household income below £23,000 may qualify for grants of up to £7,500, or even £10,000, towards insulation, heating and window glazing.

  10. fair RN-DXDZDJ

    National Grid Electricity Distribution

    Contains the rules on where a meter may sit and two fully worked cost examples. Permissible meter locations: in an external meter box (recommended), inside the property on an external wall, or in a suitable weatherproof meter cubicle; the cubicle detail is 1.5m high by 0.6m wide by 0.45m deep, and the internal-wall position allows 1,250mm by 550mm. Meters must not be located inside a dustbin, coal or refuse store, above doorways, in a bathroom, toilet or shower room, in a basement or cellar, under stairs where headroom is less than 2m, on plasterboard or drywall partition walls, close to a water source that could damage the equipment or cause an electrocution risk, or anywhere in breach of BS 7671. A surface mounted meter box protrudes 230mm from the wall, so check it will not obstruct or be damaged; a flush fit box is best built into new brickwork. Once the works are complete the meter box and cable guard become the customer's property to maintain. Worked example 1, overhead supply: overhead re-connection £1,091 plus £182 plus £91, no trench, total £1,364. Worked example 2, underground supply, customer excavation: underground re-connection £980 plus 10m of cable at £26/m (£260), total £1,240; the same job with NGED excavation: underground re-connection £2,437 plus £260 of cable plus 5m grass trench at £83/m (£415) plus 5m tarmac trench at £169/m (£845), total £3,957. A joint hole is needed to expose the existing cable, with at least 200mm of excavated ground below the cable, and warning tape is laid 75mm above the cable depth. Preparatory work such as installing the meter box must be finished before the visit or the job may be cancelled and an aborted visit charged. Bespoke offers are needed to move a three phase supply, to replace an overhead cable with an underground one, for routes crossing third party land, and for routes needing traffic lights or road closures.

  11. fair RN-JIQEG2

    National Grid Electricity Distribution

    If the meter is only moving a short distance with no change to the supply cables, the job belongs to the electricity supplier, who is the legal owner of the meter, and the DNO is not involved at all. Where the supply cable does move, the customer must arrange for the supplier to move the meter on the same day National Grid moves the supply, and must have an electrician attend to connect the supply internally. National Grid checks whether the route crosses neighbouring land and obtains landowner permission where it does. Works are normally completed within 90 days of acceptance and payment. Customers managing their own trenchworks are warned about the risk of digging in the garden and under the house near existing electricity, gas, water and telephone services.

  12. fair RN-1AMAZL

    NI Water

    The single entry point for Northern Ireland connection and asset work, listing the applications a homeowner or small developer actually needs: record requests and a site visit to confirm a connection; pre-development enquiry for a single unit, multi unit or commercial scheme; impact assessments including odour assessment; wastewater capacity information; Article 161 applications; new connections; trade effluent and septic tanks; and lead pipe replacement or separation of supply. Charges are set out in the Developer Services Summary Scheme of Charges 2026/27. A practical warning is given that an application posted with insufficient postage is held at the Post Office, NI Water will not pay the shortfall and has no way to notify the customer, so postal applications should be correctly stamped.

  13. fair RN-CC56XD

    NIE Networks

    Splits an electricity alteration in Northern Ireland into jobs NIE Networks does and jobs the customer's own electrician must do. NIE Networks moves poles, stays, mini-pillar cabinets, manhole chambers, and underground or overhead cables, and relocates the meter itself. The customer or their electrician must install the new cubicle, the backboard, the incoming hockey stick duct, and the meter tails into the premises. NIE Networks will not replace a meter backboard or a meter box (cubicle): the electrician does that, and NIE Networks temporarily turns off the power to allow it, which is built into the design so a separate temporary disconnection application is not needed. Process: apply online with a registered account, then a quotation pack sets out costs and responsibilities, and the customer has 90 days to accept, sign the offer documents and pay. Customer-side preparation such as trench excavation or installing the new meter box must be finished first, and if the site is not ready the start date is delayed.

  14. fair RN-E3OXG7

    Northern Gas Networks

    The three reconnection options after a meter move, which decide whether you also need to book your own Gas Safe engineer. Full reconnection: NGN disconnects the meter, moves it and reconnects internal pipework and appliances, available only where no more than 2 metres of internal (copper outlet) pipework is required, and a representative may visit first to confirm. Partial reconnection: NGN moves the meter but does not reconnect internal pipework, which applies where more than 2 metres of internal pipework is needed, and the customer must arrange a Gas Safe registered engineer. No reconnection: NGN moves neither meter nor connections, which applies when changing to or from a semi-concealed meter box or when the customer is arranging reconnection separately; in that case an Ofgem Approved Meter Installer (OAMI) is needed to reconnect the meter to the service pipe. Customers can opt to do their own excavations or install the meter boxes, but that must be done before the planned start date. Connections Team 0800 040 7766 option 2. Annual gas load is calculated as hourly gas load x usage hours per day x usage days per week x usage weeks per year.

  15. fair RN-HH84ZN

    Northern Gas Networks

    Timescales and the easement trap. After acceptance and payment NGN has up to 20 working days to review the works and contact the customer with a proposed start date. Reinstatement of most surfaces takes up to 5 working days after the pipe work finishes. Where a gas main or pipeline must be laid, a legal easement has to be granted first: the easement strip carries restrictions, and specifically buildings cannot be placed over the strip; the process runs between NGN's solicitors and the customer's, the easement is registrable at the Land Registry, and the legal process takes on average 4 to 8 weeks. Moving the position of a meter or the service pipe is not DIY work; the Connections team handles quotation, design, alteration and reconnection, and a separate advice route exists for diverting a gas main.

  16. fair RN-2A8QZI

    Northern Ireland Water

    NORTHERN IRELAND. NI Water requires a Building Over or Near a Public Sewer Agreement, and its conditions go beyond the England build-over agreement. Drawings must be at a scale of 1:100 or greater and colour code existing public sewers, foul in red, storm in green and combined in magenta, with private drainage in black, plus longitudinal sections showing pipe size, gradient, material, manholes and invert and cover levels to Ordnance Datum Belfast. Where building over the sewer, ONLY SUSPENDED CONCRETE FLOORS are permissible if a concrete floor is proposed. A method statement is required whether or not the pipe is being replaced, and NI Water may require a Structural Engineer's Report at the developer's expense. Critically, where there is any loan or mortgage on the property the LENDER MUST SIGN the agreement before it is returned, and the applicant must hold and provide current home insurance including buildings cover. No work may start until the agreement is authorised and returned. Applications are triaged before payment is requested, and third and subsequent applications on the same sewer leg attract a discount under the Scheme of Charges.

  17. fair RN-R859XB

    Northern Powergrid

    Northern Powergrid's published indicative connection costs and timescales, all excluding VAT. Service alteration (moving an existing supply): quotation guaranteed standard 5 days, actual average 4 days, prices from £661 single phase, average £1,000 single phase underground, average 6 weeks to connect after payment. One standard (single domestic) connection: quotation standard 5 days, average 3 days, from £1,300, average £2,500 where no LV mains cable is required, 6 weeks to connect after payment. Up to four standard connections: quotation standard 15 days, average 6 days, from £6,800, average £7,900, 10 weeks. Over four standard connections (based on six premises): quotation standard 25 days, average 27 days, from £4,100, average £14,100, 23 weeks. Unmetered connections: quotation standard 25 days, average 9 days, from £700, average £8,400, 12 weeks. Typical small business connection: from £1,900 for a single premises, average £18,100, 24 weeks. Typical large business connection: from £2,700, average £78,500, 50 weeks. EHV connections: price on application, roughly 2 years to connect.

  18. fair RN-IIVC7D

    Northern Powergrid

    Sets out exactly who owns what at the incoming supply, which is the single most misunderstood point in a rewire or extension. Northern Powergrid owns and is responsible for the service cable, the cut-out (service fuse unit) and the meter board; the energy supplier owns the meter, the timeswitch and the double-insulated cables between cut-out and meter; the homeowner owns the tails from meter to fusebox, the switchfuse and the consumer unit. Northern Powergrid will expose and cut the service cable, live joint it, reposition the cut-out, test and energise, and recover redundant equipment, but explicitly will not alter your wiring or move the meter, which must be arranged separately with the electricity supplier. The customer must install the outside meter cabinet, service duct, hockey stick and tile tape before the crew arrives. Technical requirements: ducts to ENATS 12-24, black and embossed 'Electric Cable Duct'; meter cabinets to ENATS 12-23; service ducts for 230V single conductors 38mm (125mm for three phase), smooth outer wall, uPVC or HDPE; 150mm wide tile tape laid 75mm above service ducting or 100mm above mains ducting to satisfy the Electricity Safety, Quality and Continuity Regulations 2002; duct laid so the top is 450mm (18 inches) below pathways and 600mm (24 inches) under driveways. Wrong ducting or missing tile tape means the crew will refuse to lay the cable and the connection is delayed. Freephone 0800 011 3332.

  19. fair RN-DPMAWN

    Northern Powergrid

    The split of duties when a supply has to move for an extension or a new kitchen wall. Northern Powergrid moves the service cable and the mains fuse; the electricity supplier moves the meter, and the customer must arrange for the supplier to attend on the day the network work is done; a qualified electrician must do any work on the customer's own internal wiring. Cost varies with the service required, the complexity of the work, and how and where the connection is made, and the company points customers to its published guide prices and timescales rather than quoting a flat rate.

  20. fair RN-6PKA1C

    Northern Powergrid

    Practical safety services a builder can actually book. Northern Powergrid installs shrouding on overhead lines where work will take place close to them, and offers a fast-track service for a fee under which the shrouding is completed within two working days, which matters when scaffolding or roof work is already programmed. Overgrown trees and plants near overhead lines are treated as a safety hazard and vegetation can be reported for trimming free of charge. The company also runs a live power cut map giving real-time restoration updates and a route to report a power cut.

  21. fair RN-U3ZN6C

    Northumbrian Water

    Three routes to consent for building over or within 3 metres of a sewer: the build meets the consent criteria; minor alterations are made to the network so that it does; or the build falls outside the criteria and a formal legal agreement or a payment in lieu is required. Typical criteria failures named are existing pipework deeper than 2m or an internal diameter larger than 150mm. Option 1, the Building Over Indemnity Undertaking, is a signed and witnessed legal agreement giving Northumbrian Water the right to move all or part of the building for future sewer repair without paying compensation, fee £431.00. Option 2, payment in lieu, buys the same right but with Northumbrian Water fully reinstating the building at its own cost, charged by floor area used for building regulations purposes: under 6 sq m £582 single storey / £966 two storey; 6 to under 10 sq m £682 / £1,165; 10 to under 15 sq m £812 / £1,355; 15 to under 20 sq m £930 / £1,551; 20 to under 30 sq m £1,045 / £1,745; 30 to under 40 sq m £1,167 / £1,939; 40 sq m or over £1,794 / £2,920. A CCTV survey is normally carried out within 15 working days of receiving the completed form and is paid for by the applicant. Minor alterations on small diameter sewers less than 1.05m deep may be done by the homeowner's own builder after an initial site visit, with 48 hours notice for inspection before anything is covered over, fee £120.00; deeper sewers or those over 150mm diameter must be altered by Northumbrian Water's contractors against an estimate agreed in advance. Payments on 0345 850 0514 quoting reference BOS plus house number and postcode.

  22. fair RN-30H0GK

    Northumbrian Water

    Consent is required from Northumbrian Water where there is a public sewer within 3 metres of the proposed work, both to protect the property and the sewer from damage and to preserve future access to the drainage system. The trigger is stated as planning to build within 3 metres of the public sewer. The team is contactable 9am to 4pm Monday to Friday and responds to enquiries within two working days. Applicants are directed to the published charges document before applying.

  23. fair RN-GUFJKI

    Northumbrian Water

    The ownership map that decides who pays for a drainage problem. The homeowner owns private drains within the property boundary, including all internal plumbing, gutters, downpipes, gullies, soil stacks, manhole covers and underground pipework serving only that property; private sewage treatment works and septic tanks; shared drains serving flats, such as Tyneside flats or a block within a single boundary, which stay in the owners' shared ownership; and surface water sewers that do not connect to a public sewer, for example draining to a watercourse or soakaway. Northumbrian Water owns all public sewers, usually under roads and footpaths, and most shared sewers where drains from several neighbouring properties join before reaching the public sewer. Since 1 October 2011, under the Private Sewer Transfer Regulations 2011, most existing shared private sewers and lateral drains outside property boundaries transferred to the water company, so a pipe shared with neighbours or running beyond the boundary is often theirs; properties built after 2011 generally stay with the homeowner or developer. The local authority owns highway gullies and drains, the grated openings at the road edge. Reporting line 0345 717 1100.

  24. fair RN-VH647T

    Openreach

    The commercial rules for getting a new or altered property connected. Openreach installs Full Fibre free of charge for sites with 20 or more premises, and asks for a contribution on sites of 1 to 19 premises, which is the band a self-build or a small conversion falls into. Full Fibre is the default for all new build sites: any plot connected to copper infrastructure instead is charged a flat rate of £2,500 per plot, and since 15 November 2021 Openreach New Sites no longer offers additional copper purely for service lines. Commercial-only sites of 20 or more units also get Full Fibre free. Building regulations now mandate gigabit-ready telecoms infrastructure during construction of new homes, in force in England from 26 December 2022, Scotland from 1 January 2025 and Wales from 1 July 2025. Options beyond FTTP include Ethernet Access Direct via the Network in Advance offering.

  25. fair RN-KENY6W

    Openreach

    The lead time and the money. Register the site at least eight weeks ahead of the site start date, and at least six months before broadband is wanted at the first property. Residential developments with more than 19 plots pay nothing: Openreach installs Fibre to the Premises free. Residential developments of 1 to 19 plots carry a maximum developer contribution for mandatory FTTP of £2,000 per plot; where the true cost exceeds £2,000 per plot Openreach sets out the excess and offers the option to pay it. A Service on Demand payment applies to sites with more than 11 plots. Registration needs the number and type of plots (houses or flats), whether the site is phased or part of a larger development, unique plot numbers, floor plans for every floor including plot numbers and building entrances, a schedule of accommodation, and for 20 or more plots the order of build. Building Regulations 2010 changes require gigabit capable infrastructure in all new homes in England.

  26. fair RN-2FEKWQ

    Openreach

    The installation visit, useful when planning where sockets and services go in a refurbishment. A Full Fibre install usually takes around four hours. The engineer phones ahead, agrees a route for the fibre cable and where a hole will be drilled to bring it in, and may drill a couple of extra holes outside for ladder safety, which are then repaired. A permission to work form must be signed by the customer before any drilling or digging. The fibre is run from a nearby pole or from underground to a small junction box on an external wall, then a cable runs from that junction box to the Optical Network Terminal, a white wall-mounted box inside the property. The ONT and the router must be close together and near a double socket, which is the single planning decision a homeowner should make before first fix. More complex jobs may need a return visit. Anyone relying on the phone line for an intruder alarm, health pendant or wrist alarm should tell their service provider before the copper switchover.

  27. fair RN-1AK34Y

    Property Redress

    The consumer route through a government approved property redress scheme, which every letting and managing agent must belong to. Before a complaint is accepted the consumer must have written to the agent setting out the complaint and the resolution wanted, and must have allowed the agent up to 8 weeks to investigate and respond; the agent's membership can be confirmed on the scheme's online agent finder. The complaint must reach the scheme within 12 months of the last communication with the agent about the issue. Raising a complaint is free to the consumer and can be withdrawn at any time. On process, the scheme gives the agent 10 working days to send its response and evidence or resolve directly, and once all evidence is in the case assessor has up to 15 working days to write a default or proposed decision, with a decision produced within 10 working days of allocation.

  28. fair RN-CTC3GA

    Royal Society for the Prevention of Accidents (RoSPA)

    Makes the case that stairs built to BS 5395-1:2010 cut the chance of a fall by 60% compared with stairs built only to the Building Regulations minimum, because the standard sets tighter going and rise dimensions, slip resistance and handrail provision. RoSPA has campaigned since 2022 for the standard to be made mandatory in new homes, and estimates that doing so could save the NHS up to £5 million a year through avoided accidents. Useful when specifying a new loft or extension staircase above the regulatory floor.

  29. fair RN-EGVE72

    Scottish and Southern Electricity Networks (SSEN)

    The quotation is free, carries no obligation and is valid for 90 days; if it lapses a new quotation can be requested, which restarts another 90 days. After payment a Project Manager makes contact within 5 working days. Work starts once payment is received and all required legal land rights and council permits are approved: SSEN aims to begin within 4 weeks where nothing else is needed, but where legal land rights or council permits are required works typically start within an average of 6 to 8 weeks. Excavations outside the property boundary are included in the quotation, but if more digging proves necessary on site the extra cost is notified then. SSEN will only move the electricity service cable to the desired location; the meter itself remains the energy supplier's responsibility.

  30. fair RN-3DRCAS

    Scottish and Southern Electricity Networks (SSEN)

    SSEN's published service alteration prices, all excluding VAT and excluding extras such as digging on the customer's land and traffic management. Scotland: basic overhead £435.18, basic underground £293.45, extended overhead £505.49, extended underground £505.49. England excluding London: basic overhead £380.13, basic underground £256.33, extended overhead £458.29, extended underground £458.37. London (priced higher because working costs in London differ): basic overhead £398.40, basic underground £268.51, extended overhead £477.65, extended underground £412.71. A basic alteration reuses the cable already in place; an extended alteration is needed when the new meter position requires additional cable to be bought and added. SSEN moves the service cable and main fuse only; the energy supplier moves the meter and must be booked for the same day so power is back on, and an electrician is needed for the consumer unit. A personalised quote is issued within 5 to 15 days. Appointing a private groundworker for the excavation is often more cost effective and SSEN will reduce the quotation scope accordingly.

  31. fair RN-700UXJ

    Scottish Water

    Two separate distances that both bind a build near a water main, with published tables. Access Distance, the legally supported clearance kept in every direction so the main can be repaired, maintained or renewed, measured from the outside of the pipe, with no buildings, structures or development permitted inside it: up to 180mm internal diameter, 3m; over 180mm up to 14 inch/350mm, 4.5m; over 350mm up to 18 inch/450mm, 6m; over 450mm up to 24 inch/600mm, 8m; over 600mm, minimum 10m depending on site conditions. Those minima assume a pipe invert up to 2 metres deep and may increase with depth, difficult topography or a main deeper than 2m; in constrained urban situations NJUG guidelines apply in pavements for small diameter distribution mains, larger mains in constrained urban roads need a risk assessment and method statement, and strategic mains over 600mm need detailed design referencing the Washington Suburban Sanitary Commission Pipeline Design Manual. Stand-off Distance is separate: the minimum distance habited property should sit from the main so a burst does not damage it, based on the crater size at the main's operating pressure: 2 bar 2.5m, 4 bar 5.0m, 6 bar 7.5m, 8 bar 10m, 10 bar 12m, 12 bar 14.5m, 14 bar 17m, 16 bar 19.5m, 18 bar 22m. Stand-off distances may be increased where the main is high pressure or deeper than 2m to invert, or where the property is at increased flood or damage risk if the main fails.

  32. fair RN-JWMUQZ

    Scottish Water

    Scottish Water is a statutory consultee on planning applications: when outline or full planning is submitted the local authority passes the application to Scottish Water, which along with other public bodies may be asked to comment within 21 days. It advises designing both the water supply and public sewer connections as early in the process as possible. Where a proposal affects existing infrastructure, Scottish Water may recommend a slight change to the plans to avoid building over its pipework, or require the pipework to be diverted so it can continue to access and maintain the network. 24 hour reporting line 0800 0778 778.

  33. fair RN-GHF2TN

    Scottish Water

    SCOTLAND. Scottish Water is a single public corporation covering all of Scotland, so there is no regional water and sewerage company to approach as in England, and no Thames Water or Severn Trent style build-over agreement process. The page sets out the Single House Connections route for anyone constructing a new domestic property, renovating an existing property, needing a temporary connection or a building water supply, or converting from a private water supply to the public water or sewer network, and stresses planning utility connections at the earliest stage. The process runs in four published stages, Preparing, Applying, Constructing and Completing, supported by a downloadable Single House Connections Guidance document that also covers converting from a private to a public water supply. Contact is 0800 0778 778, 24 hours a day.

  34. fair RN-5CD2AJ

    Severn Trent Water

    Severn Trent's homeowner route. A Formal Build Over Application is required where the sewer is larger than 150mm, where a manhole must be moved, altered or built over, or where the project fails the self-certification criteria; smaller works can use the self-certification form. The company states it cannot grant approval retrospectively. Review of a formal application takes up to 10 working days, then provisional approval with conditions, then building, then a post-construction CCTV survey report before final approval; any remedial cost falls on the applicant. Permitted development rights and planning permission do not remove the need for the sewer approval, because utility locations are not considered in the planning process. Since the October 2011 private sewer transfer Severn Trent maintains most shared drains and sewers in its region, and most of those transferred pipes do not appear on maps. Advises early contact where the sewer is 300mm diameter or over, as permission may not be granted. A protective strip, measured from the centre of the pipe, must be kept clear for maintenance, sized by pipe diameter.

  35. fair RN-KW1EOK

    Severn Trent Water

    The technical rules a builder actually needs. Fees: Class 1 up to and including 150mm sewers £169.50, Class 2 225mm sewers £194.70, Class 3 complex applications at cost. A complete application normally gets a decision within 10 working days. Applies to existing homes extending over small diameter sewers of 100mm to 225mm; not for new-build. Construction rule for both building close to and building over: where foundations come within 1.0m of the sewer at any point they must be taken down below the invert level of the sewer; beyond 1.0m a 45 degree line may be taken from a point one metre clear of the sewer up to the required footing level. The 3.0m proximity is measured from the nearest point of the building including foundations to the centreline of the sewer, and depth is measured to the pipe invert. No pre-works CCTV and electro-location survey is needed for 100mm or 150mm sewers if the position is demonstrated and the foundation shown to be harmless, or for 225mm sewers if the building is no closer than 1 metre; otherwise a survey is required, and a post-works CCTV survey is always required. Any access chamber or rodding eye falling inside the new building must be replaced by a new manhole on the sewer line outside the building, with connections re-laid. Complex cases include a formal easement in the deeds, sewer depth over 3 metres, pressurised rising mains (never permitted to be built over), strategic sewers, and piling or ground stabilisation. All work must comply with Building Regulations 2010 Part H4 and be approved by building control before backfilling. CCTV surveys must follow the WRc Model Contract Document for non-man-entry sewer inspection and the UK Water Industry Manual of Sewer Condition Classification.

  36. fair RN-BPOL4H

    Severn Trent Water

    How to get the asset plans that decide whether a build-over application is needed. Water and sewer pipes sit on separate maps, so each dataset is downloaded and charged for separately, with a discount for buying both together; maps are supplied through DigDat, which charges because it overlays detailed utility plans on Ordnance Survey mapping under licence and maintains the asset records. Map charges are set out in the annually updated Charging Arrangement Document. Eligible organisations such as councils, utility companies and government bodies can apply for free statutory access, conditional on proving their role and on not charging the public or reselling the data, which is why a homeowner cannot get the same free access. Severn Trent's Asset Protection team handles planned work near pipes, development queries, ownership questions, insurer-raised issues, sewer defect assessments and subsidence claims.

  37. fair RN-QO0MQN

    SGN (Scotland and Southern Gas Networks)

    SGN publishes standard alteration prices by region, all plus VAT, and lets the customer cut the cost by digging the trench themselves. Scotland: £795 if SGN digs the trenches, £504 if you dig them; refit the meter £103; refit the meter and reconnect the meter outlet pipework £207; lead time normally 6 to 12 weeks after quote acceptance. Southern England inside the M25: £1,007 if SGN digs, £710 if you dig; refit meter £110; refit meter and reconnect outlet pipework £222; lead time 6 to 12 weeks. Southern England outside the M25: £859 if SGN digs, £598 if you dig; refit meter £110; refit and reconnect £222; lead time 10 to 12 weeks. Alterations needing more than 5 metres of pipework are charged extra per metre up to a maximum of 20 metres; beyond 20 metres, or for a flat on the second floor or above, no instant quote is issued and the case is reviewed manually. Excavations in road or pavement are reinstated by SGN's reinstatement team within 5 working days of the job. The land must be owned by the applicant or written landowner permission held, and any planning permission or local authority permit must already be in place.

  38. fair RN-NPR8JO

    Shelter England

    Access rules during repair works in a rented home. The tenant must let the landlord in to check gas and electrical safety, fix reported problems, deal with anything making the home unfit to live in, and deal with serious damp and mould affecting health. The landlord must give reasonable notice, which is usually at least 24 hours and must be in writing for an inspection, must have a good reason to attend and must treat the property as the tenant's home; notice can be very short for a genuine emergency but the landlord must still tell the tenant first rather than simply turning up. Social landlords must make a home safe within 24 hours where there is an emergency hazard. Even where a tenancy agreement requires the tenant to allow viewings, the landlord still needs the tenant's agreement and should arrange times that suit.

  39. fair RN-4Q6LDP

    Shelter England

    Sets out the compensation routes and the clocks. Social landlords have had to deal with serious problems in a home to set timescales since 27 October 2025, with 24 hours for an emergency hazard. A Housing Ombudsman complaint must normally be made within a year of the landlord's final response. Letting agents and property managers must belong to one of the 2 government approved redress schemes. For a court claim the tenant must have reported the problem during the tenancy, and has up to 6 years to claim for disrepair or 3 years for personal injury, running from when the landlord should have done the work.

  40. fair RN-CNK2S5

    Shelter England

    Using the council's environmental health team to force repairs. They investigate serious repair problems that affect health or create risk, and can be approached where the landlord or letting agent ignores reports or fails to fix things in a reasonable time. Their tools include inspecting under the housing health and safety rating system, serving an improvement notice that tells the landlord how to fix the problem and sets a deadline, and taking emergency action. The council must give the tenant a copy of any notice within 7 days.