A builders’ merchant quote looks straightforward until you try to compare two of them side by side. Different merchants price the same material in different units, present VAT differently, and bury delivery or surcharge costs in places that aren’t immediately obvious. Getting a quote wrong, or failing to compare properly, is one of the easiest ways to overpay on a materials order.
This guide walks through the key elements of a merchant quote and the common traps to watch for.
Ex-VAT vs Inc-VAT: The First Thing to Check
Trade merchant quotes are almost universally presented ex-VAT (excluding VAT) because their customers are predominantly VAT-registered businesses who reclaim the tax. The price you see on the quote is not what a non-VAT-registered homeowner pays at the till.
At the standard rate of 20%, a materials order quoted at £1,000 ex-VAT becomes £1,200 inc-VAT.1 On a larger order this difference is substantial, and it’s easy to miss when quotes are being scanned quickly.
When comparing quotes:
- Always confirm whether figures are ex-VAT or inc-VAT.
- If you are VAT-registered, compare on an ex-VAT basis, you’ll reclaim the VAT regardless of which merchant you use.
- If you’re a homeowner who can’t reclaim VAT, compare on an inc-VAT basis so you’re comparing the true cash cost.
Understanding Unit Pricing and Pack Sizes
The unit used in a quote isn’t always the unit you’re thinking in. Common sources of confusion:
| Material | Unit Often Quoted | Common Alternative |
|---|---|---|
| Bricks | Per 1,000 | Per brick (sometimes per pack of ~400) |
| Concrete blocks | Per block | Per 100 or per layer |
| Sand / aggregates | Per tonne | Per 25kg bag or per bulk bag (check the stated weight, which varies by supplier) |
| Plasterboard | Per board | Per pack of 15 or 30 |
| Timber | Per metre | Per piece at a stated length |
| Roofing felt | Per roll (stated width and length) | Per square metre |
| Screws / fixings | Per box of 100 or 200 | Per unit or per 1,000 |
A quote showing “blocks at £X per 100” and another showing “blocks at £Y per block” need to be converted to the same unit before comparison. Divide by 100 or multiply by 100 as needed.
Pack size matters too. A quote for plasterboard may price per board, but boards are delivered in packs. If your project requires 47 boards and they only come in packs of 15, three packs (45 boards) leave you two short, so you would need four packs (60 boards) or a top-up from a different source.
The Quote Structure: What to Look For
A well-structured merchant quote should include the following. If any of these are missing or unclear, ask before you accept:
1. Product description and specification. Not just “bricks”, which brick, which colour, which manufacturer code. The same description from two merchants might be different products. If you’re matching an existing material, get the product code and confirm it’s the same batch or a compatible specification.
2. Quantity and unit. Exactly how many of what unit is being priced. The total amount supplied and the price per unit should both be visible.
3. Price ex-VAT and VAT amount. Shown separately, with the total inc-VAT at the bottom.
4. Delivery cost. This should be listed as a separate line. If it isn’t listed at all, confirm whether delivery is included or will be added to the final invoice. “Free delivery” is sometimes conditional on a minimum order value.
5. Lead time and validity. How long is this price valid? Material prices can move quickly: the government’s material price index for all construction work rose 6.0% in the year to June 2026, and fabricated structural steel rose 17.7%.2 A quote with a stated validity period, such as 30 days, is safer than one with none.
Hidden Extras That Inflate the Bill
Several charges can appear on the final invoice that aren’t always visible in the initial quote:
- Small order surcharge: Some merchants add a surcharge to orders below a minimum value. Check the amount and the threshold before you order.
- Fuel / delivery levy: A percentage surcharge on delivery, applied to cover fluctuating fuel costs. Not always listed in the headline delivery charge.
- Pallet surcharge: If materials arrive on pallets, the merchant may charge a pallet deposit, which is usually refunded when the empty pallets are returned in good condition.
- Cut-to-size or processing fee: For bespoke timber lengths, sheet material cuts, or steel sections cut to length.
- HIAB or specialist delivery premium: If your access requires a crane offload vehicle rather than a standard lorry.
Always ask for a full breakdown, not just the line-item materials prices, before committing to an order.
Comparing Quotes from Different Merchants
To compare fairly, you need quotes from at least two (ideally three) merchants on an identical specification. This process is called a like-for-like comparison and it requires more discipline than it sounds:
-
Send the same schedule of materials to each merchant. A written list with product descriptions, specifications, and quantities. Don’t describe the materials differently to different merchants, even small wording differences can result in you being quoted on different products.
-
Request a written quote, not a verbal price. Verbal prices are hard to pin down and may not match what appears on the invoice.
-
Ask for delivery costs included. Get the total landed cost, not just the ex-works price.
-
Compare the full total, not the headline unit price. A lower unit price can be offset by higher delivery costs, surcharges, or minimum order requirements.
Price differences between merchants on the same specification are common, and worth the time it takes to request a second quote. On a larger project where materials run to tens of thousands of pounds, even a 5% saving is a meaningful sum.
How to Negotiate
Merchant pricing is not fixed. The price list is a starting point, and most branches have flexibility, particularly for larger orders, for customers with existing accounts, or where you can offer to consolidate your spend.
A few approaches that work:
- Show competing quotes. Most branch managers will match or beat a genuine like-for-like quote from a competitor. Have the quote in hand, not just a rough memory of the number.
- Ask about package discounts. If you’re buying multiple product lines, ask whether a discount applies to the whole basket. A branch that can’t move on bricks may be more flexible on the sand, cement, and blocks if you’re buying all three from them.
- Ask about payment terms. If you can pay promptly (or settle on a cash basis), some branches offer a small settlement discount, though this is less common than it once was.
- Negotiate at the right time. Towards the end of the month, when branch sales staff are working against targets, there can be more flexibility than at the start of the month.
Reading a merchants’ quote carefully and comparing properly isn’t a minor admin task, it’s where a significant portion of your materials budget is set. Take an hour to do it properly and you’ll typically recover that time many times over in savings.
References (2)
Figures in this note were checked against the sources below on 30 September 2026. Superscript numbers in the text point to them. Every source the site cites, by topic.
- 1technicalvery strongHM Revenue & Customs (GOV.UK), guidance.RN-4W7T33Sets the three UK VAT rates: standard 20% on most goods and services, reduced 5% on some goods and services such as children's car seats and home energy, and zero 0% on zero-rated goods such as most food and children's clothes. The standard rate rose to 20% on 4 January 2011 from 17.5%. Some supplies are exempt rather than rated, including postage stamps and financial and property transactions. This is the reference for converting a merchant's ex-VAT trade quote into the figure a homeowner actually pays.
- 2technicalvery strongDepartment for Business and Trade.RN-WG2Q3CMonthly official commentary on construction material prices and deliveries, the tier 1 series to cite for any materials-inflation claim. The material price index for 'All Work' increased by 6.0% in June 2026 compared with June 2025, and repair and maintenance rose 5.7% over the same period. Fabricated structural steel was the largest single price mover at 17.7% year on year. Deliveries of bricks fell 16.3% and blocks 12.3% in June 2026 against June 2025. Prices of inputs of metals and non-metallic mineral products rose 8.4% in the year to July 2026, against a revised 9.0% in the year to June, driven partly by basic iron, steel and ferro-alloys. Sawn wood over 6 mm thick was a GBP1,176 million import category in 2025 but no timber-specific annual price change is given in this edition. Published monthly, roughly one month after the reference period, with data tables in Excel and ODS.
-
VAT rates, GOV.UK, accessed 9 September 2026. gov.uk
-
Construction building materials: commentary July 2026, Department for Business and Trade, accessed 9 September 2026. gov.uk