An Electrical Installation Condition Report (EICR) is the formal document that confirms whether the fixed electrical installation in a property, the wiring, consumer unit, sockets, light fittings and earthing, is safe for continued use, judged against the current edition of BS 7671 (the IET Wiring Regulations).1 It is not a simple MOT-style pass/fail: it grades each defect from C1 (danger present) through to C3 (improvement recommended), then gives an overall verdict of satisfactory or unsatisfactory, so you can see what needs urgent attention and what can wait.2

For rented homes in England, an EICR is a legal requirement under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, which a 2025 amendment extended to social landlords.2 Local councils can fine landlords who breach the regulations up to £40,000.2

What an EICR Covers

The inspecting electrician will test and visually inspect:

  • Consumer unit (fuse board), condition, labelling, presence of RCDs and surge protection
  • Earthing and bonding, main protective bonding to gas, water and other services; supplementary bonding in bathrooms
  • Circuits, continuity and insulation resistance tests on each ring final, radial and lighting circuit
  • Sockets and switches, polarity, condition, appropriate ratings
  • Fixed appliances, cooker connections, shower circuits, EV charger circuits if installed
  • Adequacy of wiring, whether the existing wiring type (e.g., rubber-sheathed wiring in older properties) poses a risk

The inspector will not test portable appliances (that is covered by PAT testing) and will not open up wall chases to inspect buried cable.

EICR Cost in the UK (2026)

Property TypeTypical EICR Cost
1–2 bedroom flat£150–£220
3 bedroom semi-detached£200–£280
4–5 bedroom detached£260–£380
Large HMO (per dwelling unit)£80–£150 per unit
Additional remedial report£60–£120

London prices tend to sit above these figures. NICEIC and NAPIT registered electricians may charge a small premium over unregistered contractors, the extra cost is almost always worth it for the quality assurance.

Beware very cheap EICRs advertised for £99 or less for a three-bedroom house. A thorough inspection of an average home, with insulation resistance testing on every circuit, typically takes two to four hours, and older or larger properties can take half a day or more.3 An inspector who charges £99 is unlikely to be spending that time.

How Often Do You Need an EICR?

  • Owner-occupied homes: every 10 years is the recommended interval, not a legal requirement, and Electrical Safety First also advises one before selling or buying a home1
  • Private rental properties: every 5 years (a new inspection is not required at a change of tenancy if a valid report exists, but the latest report must be given to each new tenant), this is a legal minimum in England under the 2020 Regulations2
  • Houses in Multiple Occupation (HMOs): every 5 years, under the same 2020 Regulations, which apply to HMOs as to other rented homes2
  • New installations: on completion of a new build or full rewire, an Electrical Installation Certificate (EIC) is issued rather than an EICR; the first EICR is then due on the date the certificate recommends, usually 10 years later for an owner-occupied home and 5 years for a rental

Understanding the Code Grades

CodeMeaningAction Required
C1Danger present, risk of injuryImmediate remedial work
C2Potentially dangerousUrgent remedial work (usually within 28 days)
C3Improvement recommendedNo urgent action, but worth addressing at next opportunity
FIFurther investigation requiredInvestigate without delay (for rentals, within 28 days)

An EICR is deemed satisfactory if it contains no C1 or C2 codes, and any FI item still has to be investigated.2 A C3 alone does not constitute a fail.2 If the report contains any C1 or C2 items, remedial work must be completed and a minor works certificate or a new EIC issued before the installation can be re-classified as satisfactory.

What Happens After a Failed EICR

  1. Obtain quotes from two or three registered electricians for the remedial work. The inspector who issued the EICR is not automatically the right person to carry out the remediation, so compare their price with the others.
  2. Prioritise C1 issues: these must be made safe immediately, sometimes by isolating the circuit at the consumer unit until it can be repaired.
  3. For rental properties, remedial or further investigative work must be done within 28 days, or sooner if the report says so: this is the statutory timeframe under the 2020 Regulations.2
  4. Once remedial works are complete, the electrician issues an Electrical Installation Certificate (EIC) or minor works certificate for the specific circuits repaired.2 You then have a satisfactory EICR supported by the remediation certificate.

Common remedial costs: replacing a consumer unit £500–£900; adding RCD protection to an existing board £150–£300; rewiring a single circuit £200–£500; bathroom supplementary bonding £100–£200.

Choosing a Qualified Electrician

Only electricians registered with an approved Part P competent person scheme can self-certify their own work without notifying the local authority building control.4 The main schemes are:

  • NICEIC (National Inspection Council for Electrical Installation Contracting)
  • NAPIT (National Association of Professional Inspectors and Testers)
  • Another scheme authorised by government; the full list of competent person schemes is published on GOV.UK

You can verify registration at the NICEIC or NAPIT websites. Always ask to see the electrician’s current scheme membership card. An unregistered electrician can still carry out notifiable work legally, but it must then be notified to building control or certified by a registered third-party certifier, which adds cost and delay, and may complicate property sales or insurance claims.4

EICRs for Buyers and Sellers

An EICR is not a standard requirement for conveyancing, but it is becoming increasingly common for buyers to request one as part of their survey process, particularly for older properties. If you are selling an older house whose wiring has not been updated for decades, arranging an EICR before listing can remove a potential negotiating chip and speed up the sale.1

Properties with TT earthing systems (common in rural areas on overhead supplies) require particular care, the earthing arrangements are more complex and the EICR inspector must have experience with these installations.

Summary

An EICR is a low-cost way to confirm that one of the most dangerous systems in your home is safe. For landlords it is a legal obligation; for owner-occupiers it is good practice every decade. Budget £150–£300 for a flat or three-bedroom house, more for a large detached home, use an NICEIC or NAPIT registered inspector, and address any C1 or C2 codes promptly. Keep the report: insurers, lenders and future buyers may ask to see it.

References (4)

Figures in this note were checked against the sources below on 30 September 2026. Superscript numbers in the text point to them. Every source the site cites, by topic.

  1. 1technicalfairElectrical Safety First, guidance.RN-G8EWAUElectrical Safety First's explainer on periodic inspection: a competent person checks the installation against BS 7671 and issues an EICR recording defects and whether the installation is satisfactory.
  2. 2technicalvery strongMinistry of Housing, Communities and Local Government, guidance.RN-IUHGG0The definitive figures for an EICR note. The electrical installation must be inspected and tested at least every 5 years by a qualified person competent to undertake the inspection and testing, against the 18th Edition of the Wiring Regulations published as British Standard 7671. The report must go to existing tenants within 28 days of the inspection and test, to new tenants before they occupy the premises, and to the local council within 7 days of a request. Remedial work must be completed within 28 days, or any shorter period specified as necessary in the report. The observation codes are C1 danger present with risk of injury, C2 potentially dangerous, C3 improvement recommended and not mandatory, and FI further investigation required without delay. A local housing authority can impose a financial penalty of up to £40,000.
  3. 3technicalsupplier figureElectrical Testing London, guidance.RN-RIL793An electrical testing contractor's published guide to EICR prices and time on site, giving two to four hours for an average home and longer for older or larger ones. Tier 5: a contractor's own page; no official source states inspection durations.
  4. 4technicalvery strongMinistry of Housing, Communities and Local Government.RN-JYJ3I5The document that decides what electrical work a homeowner may legally do themselves, and the exact list of notifiable jobs. Regulation 12(6A), reproduced at paragraph 2.5, makes only three things notifiable: the installation of a new circuit, the replacement of a consumer unit, and any addition or alteration to existing circuits in a special location. Regulation 12(9) defines special location as, in a room containing a bath or shower, the zone extending vertically from finished floor level to 2.25 metres (or the shower head position if higher) and horizontally 600mm from the edge of the bath tub or shower tray. Paragraph 2.7 states that all other electrical installation work is not notifiable, namely additions and alterations to existing installations outside special locations, and replacements, repairs and maintenance anywhere. Paragraph 2.8 gives worked examples: a built-in cooker is not notifiable unless a new cooker circuit is needed, and connecting an electric gate or garage door to an existing isolator is not notifiable but running a new circuit from the consumer unit to that isolator is. Paragraph 2.2 confirms Part P reaches outdoor work including fixed garden lighting, pond pumps and outbuildings such as sheds, detached garages and domestic greenhouses. Notifiable work must be certified by self-certification by a registered competent person, third-party certification, or a building control body (paragraph 3.1), with the compliance certificate issued within 30 days (paragraph 3.4). Note that Approved Document P is a source of guidance rather than a ban: non-notifiable work still has to comply with BS 7671.
  1. Periodic Inspection and Testing Explained, Electrical Safety First, accessed 30 September 2026. electricalsafetyfirst.org.uk

  2. Electrical safety standards in the private and social rented sectors: guidance, Ministry of Housing, Communities and Local Government, accessed 7 September 2026. gov.uk

  3. Electrical Installation Condition Report cost: 2025 prices, Electrical Testing London, accessed 30 September 2026. electricaltestinglondon.co.uk

  4. Approved Document P: Electrical safety, dwellings (2013 edition), HM Government, accessed 30 September 2026. assets.publishing.service.gov.uk