Fitting a new bathroom is one of the most cost-variable renovations in a UK home. A straightforward like-for-like replacement of sanitaryware in a small en-suite can be completed for under £5,000; a full wet room with underfloor heating, bespoke joinery, and natural stone in a large family bathroom can exceed £35,000. Understanding what drives cost — and what you are actually paying for — makes it much easier to set a realistic budget and identify where to spend and where to save.

The headline ranges: a basic new bathroom costs £4,500–8,000; mid-range £8,000–15,000; high-end £15,000–35,000+. These are supply-and-fit totals for a typical 4–6m² bathroom, excluding VAT.

What Drives Bathroom Cost

The single biggest cost driver is whether the plumbing needs to move. Replacing sanitaryware in the same positions is a straightforward plumbing exercise; relocating the bath to the opposite wall, moving the soil stack, or adding a shower where there was none requires significantly more pipework, structural consideration, and potentially Building Regs involvement.

Specification — the quality of tiles, sanitaryware, and fixtures — is the second major driver. Budget tiles at £20–40/m² versus natural stone at £100–200/m² represent a cost difference of £500–2,500 on a typical bathroom just in materials, before accounting for the additional installation time stone requires.

Access and condition are often underestimated. Old bathrooms frequently reveal hidden problems once stripped: rotted joists beneath the bath, inadequate waterproofing behind old tiles, failed plumbing connections. A contingency of 10–15% on top of the quoted price is sensible.

Cost Breakdown by Element

ElementBasic rangeMid-rangeHigh-end
Strip-out and disposal£300–500£400–700£500–800
Plumbing (supply and waste, like-for-like)£800–1,200£1,200–2,000£1,800–2,500
Plumbing (significant relocation / new circuits)£1,500–3,000£2,500–4,500£4,000–8,000
Electrics (Part P: lighting, extractor, towel rail)£400–600£600–800£800–1,200
Tiling (walls + floor, typical 10m²)£800–1,400£1,200–2,500£2,000–5,000
Tiles (materials, 10m²)£200–400£400–1,200£1,200–3,000
Bath (supply)£200–500£500–1,200£1,200–4,000
Bath installation£150–250£200–350£250–500
Shower enclosure and tray (supply)£250–600£600–1,500£1,500–5,000
Shower installation£150–300£250–400£350–700
WC pan and cistern (supply)£100–250£250–700£700–2,000
Basin and vanity unit (supply)£150–400£400–1,000£1,000–4,000
Heated towel rail (supply + fit)£150–350£300–600£500–1,200
Flooring (if not tiled — LVT or similar)£200–400£400–800£800–2,500
Plasterboard and waterproofing£200–400£300–600£500–1,000
Builder / project management£300–600£500–1,000£1,000–3,000

Worked Example: 5m² Mid-Range Bathroom (2026)

A typical mid-range full refurbishment of a 5m² family bathroom in a three-bedroom semi-detached, replacing all sanitaryware in approximately the same positions, with ceramic wall tiles and luxury vinyl flooring.

ItemEstimated cost
Strip-out and skip/disposal£550
Plumber (3 days @ £300/day)£900
Plumbing materials (pipe, waste, valves)£350
Electrician (1.5 days @ £320/day)£480
Electrical materials (fan, lighting, wiring)£200
Waterproofing and plasterboard£450
Tiler (4 days @ £260/day)£1,040
Wall tiles (8m² @ £45/m²)£360
Floor tiles (5m² @ £55/m²)£275
Tile adhesive, grout, edge trims£180
Bath (freestanding-style acrylic)£650
Shower enclosure and tray£850
WC with concealed cistern£500
Basin and vanity unit (600mm)£550
Heated towel rail (supply + fit)£380
Mirrors, accessories£200
Builder (1 day, coordination and making good)£280
Contingency (10%)£820
Total (ex-VAT)£8,815
VAT at 20%£1,763
Total (inc-VAT)£10,578

This is a realistic all-in figure for a competent mid-range bathroom in London and the South East. Costs are 10–20% lower in most other UK regions.

Trade Day Rates in 2026

Day rates vary by region (London and South East are highest), experience, and whether the tradesperson is self-employed or from a firm with overhead.

TradeTypical day rate (UK, 2026)London / South East
Plumber£250–350/day£320–420/day
Tiler£200–300/day£260–370/day
Electrician£250–380/day£300–430/day
Labourer / general builder£150–220/day£190–270/day

Day rate work suits experienced tradespeople you have vetted and trust; fixed-price quotes give more certainty for larger projects but may build in a contingency premium. Always obtain three quotes for a bathroom project and ask for itemised breakdowns — this makes comparison meaningful and negotiation honest.

Wet Room vs Shower Tray

A wet room (fully tanked floor-level shower area, no tray or enclosure) costs more than a standard shower enclosure and tray. Proper tanking — applying a liquid waterproof membrane to all walls and the floor before tiling — adds £400–900 to the tiling cost and requires a minimum drying time between coats. The floor must also slope to the drain at a minimum 1:80 fall, which typically requires a screeded former or a dedicated wet room tray under the tile finish.

A shower tray installation is faster, cheaper, and more forgiving of minor waterproofing lapses, but limits the size and shape of the shower. A 900×900mm tray and enclosure can be installed in half a day by an experienced plumber; a wet room of the same floor area takes a tiler two to three days of tanking and tiling.

Building Regulations Requirements

Part P (Electrical safety) applies to all electrical work in a bathroom. Any new circuit, new consumer unit connection, or significant alteration to existing bathroom wiring must be carried out by a Part P registered electrician (NICEIC, NAPIT, or similar scheme member) who will self-certify their own work, or by an unregistered electrician whose work must be inspected and certified by Building Control.

Part G (Sanitation, hot water safety, water efficiency) requires a thermostatic mixing valve (TMV) on baths in dwellings where children under five or vulnerable adults are present — the valve limits hot water supply to the bath to a maximum of 48°C. New WCs must use a maximum 6-litre flush (dual-flush cisterns meeting WaterLabel standards are standard). Taps and showers must meet minimum flow rate requirements under the Water Regulations.

Part F (Ventilation) requires a minimum 15 litres per second extract rate for a bathroom with a bath or shower. A window alone does not satisfy this; a mechanical extract fan is required. Fans must be capable of operating via an overrun timer (typically 15 minutes after the light is switched off) to fully clear moisture.

VAT

Standard-rate 20% VAT applies to most bathroom fitting and supply work. A reduced rate of 5% VAT applies to some energy-saving materials — specifically qualifying insulation, draught-proofing materials, and renewable heat products — installed in eligible dwellings, but this does not reduce the rate on sanitaryware, tiling, or general plumbing. Some specialist bathroom companies offer supply-only pricing (zero-rated for certain residential supplies); confirm the VAT treatment with your contractor in writing before signing a contract.

What Pushes Cost Up

Moving the soil stack — the large 110mm soil pipe that carries waste from the WC — is among the most expensive single plumbing alterations in a bathroom project, adding £1,500–4,000 or more depending on its route through the building and whether it exits through an external wall or through the roof.

Structural changes — cutting a new opening for a skylight or window, removing a non-structural partition to enlarge the room — add both labour cost and Building Regs implications.

Underfloor heating (UFH) under tiles adds £50–100/m² for electric mat systems and requires the tiler to integrate the mat into the tile adhesive bed. Wet UFH systems in a bathroom refurbishment are less common due to the complexity of connecting to the heating circuit.

Premium tiles slow the tiler down significantly. Large-format tiles (600×1,200mm or above), natural stone, and intricate mosaic work can reduce output to 2–3m² per day, doubling tiling costs compared with standard 30×60cm ceramic.

Bespoke fitted furniture — full-height vanity units, drawer towers, and mirror cabinets from a bespoke joiner — adds £2,000–8,000 over standard freestanding or semi-fitted furniture.